Page 2 - New England Condominium January 2020
P. 2
2 NEW ENGLAND CONDOMINIUM
-JANUARY 2020
NEWENGLANDCONDO.COM
around all penetra5ons. Drip Edge to be sealed at the top edge with a 9-‐inch strip of Winterguard aeer installa5on.
HAVE YOU
RECEIVED A BID
THAT RAISED A...
FLEXIBILITY:
Our project managers work with clients,
adapting and re-engineering to keep you on budget,
helping to avoid unnecessary change orders
OVERSIGHT:
In addition to having a construction
supervisor on every job, Bryan Kelly, Owner, attends
onsite meetings weekly
FIRST
CALL FOR A
SECOND
BID
888-KELLY-11
www.kellyspropertyservices.com
bryan.kelly@kellyspropertyservices.com
508-958-2196
A favorite for quality and value since 1989
Fully licensed and insured in New England.
RED
FLAG?
Having doubts? Make us your
ROOFING · WINDOWS · SIDING · DECKING · MASONRY
CONDOMINIUM
DIVISION
Building Envelope Replacement Specifica5ons, Material Quan55es nvelope Replacement Specifica5ons, Material Quan55es nvelope Replacement Specifica5ons, Material Quan55es
Remove Roof Deck Sheathing to allow for the Installa5on of New Baffles, Close Off Opening from Hix Vent and Install New 5/8" emove Roof Deck Sheathing to allow for the Installa5on of New Baffles, Close Off Opening from Hix Vent and Install New 5/8" emove Roof Deck Sheathing to allow for the Installa5on of New Baffles, Close Off Opening from Hix Vent and Install New 5/8" emove Roof Deck Sheathing to allow for the Installa5on of New Baffles, Close Off Opening from Hix Vent and Install New 5/8" emove Roof Deck Sheathing to allow for the Installa5on of New Baffles, Close Off Opening from Hix Vent and Install New 5/8"
Building E
and Pricing (30 x Homes & 1 x Pumphouse)
R R R R
Building E
Installa5on of new DCI Smart Baffle -‐ assumed 16" OC Roof Framing
(3)
Remove and dispose of exis5ng Roof shingles and install new
square).
"Hurricane Nailing Paaern" -‐ 6 nails per shingle Required. Shingle paaern as per manufacturer's specifica5ons. Includes ridge
vent, starter shingles, etc... Reference the include roof specifica5ons for all details.
(4)
Membrane flashing detail on Roof Deck:
CertainTeed WinterGuard
(Material Only).
3 x 36" Courses w/ proper overlaps at Eaves, 3' at
Rakes behind the new PVC Rakes, 2 x 36" courses with proper overlaps at Valleys, 3' at Ridge, 18" on deck at wall transi5ons, 3' at Hips, 18"
around all penetra5ons. Drip Edge to be sealed at the top edge with a 9-‐inch strip of Winterguard aeer installa5on.
FLAG?
FLAG?
BID FORM
CONDOMINIUM:
Building Envelope Replacement Specifica5ons, Material Quan55es lding Envelope Replacement Specifica5ons, Material Quan55es lding Envelope Replacement Specifica5ons, Material Quan55es
Bui
Bui
and Pricing (30 x Homes & 1 x Pumphouse)s & 1 x Pumphouse)s & 1 x Pumphouse)
and Pricing (30 x Home
and Pricing (30 x Home
(A). ROOFING SPECIFICATION
(1)1)
(
Remove Roof Deck Sheathing to allow for the Installa5on of New Baffles, Close Off Opening from Hix Vent and Install New 5/8" emove Roof Deck Sheathing to allow for the Installa5on of New Baffles, Close Off Opening from Hix Vent and Install New 5/8"
R
CDX Sheathing (4' at Eaves)
Installa5on of new DCI Smart Baffle -‐ assumed 16" OC Roof Framing
Remove and dispose of exis5ng Roof shingles and install new emove and dispose of exis5ng Roof shingles and install new
R
Ask our references!
10-20%
ON BUILDING ENVELOPE PROJECTS
LOWER
PRICES!